After 2 weeks of discussion, our company finally reached all consensus with customers, and signed a purchase contract for 70 stainless steel pipe welding machine, 159 caliber welded pipe mold and large 8-head cylindrical polishing machine.
Customers currently only produce one type of stainless steel pipe, that is, 159 caliber welded pipe, so we recommended our 70 stainless steel pipe welding machine and welded pipe mold to them, and introduced a large 8-head cylindrical polishing machine to the customer. The customer is very appreciative of our service and quality program. After finally solving all the customer's doubts, the customer signed a contract without going to our company for a field visit. At present, the deposit of the customer's payment has been received, and the materials for the stainless steel pipe welding machine and welded pipe mold will be purchased soon. At the same time, it is necessary to conduct business docking with the production partnership of the cylindrical polishing machine, because the cylindrical polishing machine is produced in cooperation with the enterprises in the industry. Because the customer is in a hurry to urge, the production cycle is relatively tense. In the next few days, we will be serious and intensive to carry out related work, and strive to give the stainless steel welding pipe machine, welded pipe mold and cylindrical polishing machine as soon as possible. And commissioning before leaving the factory, pay close attention to the delivery of quality and quantity on time.
Waiting for the delivery to be completed, I will take our installer to personally serve the customer in the past. Let the customer feel not only our technology and strength, but also our serious and good service attitude.Next : Pipe welding equipment, pipe welding mold, pipe polishing machine for supporting, better service for Back
Home
- [2021.07.09]Two patent applications …
- [2021.07.08]GXG technology passed IS…
- [2021.07.07]Installation of heavy th…
- [2020.08.27]Drawings of welded pipe …
- [2021.03.05]Our first Iranian custom…
- [2021.03.04]Installation of stainles…
- [2020.08.26]The 159caliber stainless…
- [2020.08.26]159 stainless steel roun…
- [2025.05.14]Training and acceptance …
- [2025.03.28]Indian luggage telescopi…
- [2025.02.11]New Year holiday does no…
- [2024.11.18]Welcome Yemeni customers…
- [2024.10.08]High frequency welded pi…
- [2024.04.24]Customer repurchase is t…
- [2020.08.12]Quality first, reasonabl…
- [2024.01.26]High frequency welded pi…
- [2023.11.14]Thanks to customers from…
- [2021.06.24]Congratulations on the s…
- [2023.09.04]Successful debugging of …
- [2023.05.22]Our new stainless steel …